Chongqing Changan Automobile
Model: R111 SUV
Project content: from preliminary scheme planning to design and manufacturing, it is divided into main welding line, side wall line, rear wall line, floor line, front wall line, top cover line, door line, and EMS sling conveying system. The body welding line can meet the flexible production of platform series body. There are 30 robots in the overall project, 14 stations in the main welding line and 18 robots, all of which adopt robot automatic welding, 4 robots for floor line body and 8 robots for side line body. The main line is transported by trolley to and fro, and the qualified rate of the whole vehicle reaches 92-95%, which is highly appreciated and recognized by customers.
Production program: 30jph development time: 2016 ~ 2017