Sichuan FAW Toyota

Model:PRADO
Project content: the fixture and welding workshop assist in the planning and relocation of the whole plant. The assembly is subcontracted to the main welding line (Japan), floor line, front wall line, side wall line, top cover line, door line and split fixture, door line, nut projection welding area, adjustment line and WBS conveying system. The body welding line can meet the production of platform series body. A total of 12 stations of the main welding line of the overall project adopt manual welding, the floor line adopts manual welding, and the side wall line body, engine compartment line and top cover line adopt manual prying. The qualified rate reaches 90-95%, which is highly recognized by customers.
Production program: 6jph development time: 2009 ~ 2010